Project· Hospitality· Playa Mujeres, Quintana Roo

St. Regis Costa Mujeres

MODECO designed, fabricated and installed the architectural concrete slab edges and screens for the hotel and residences at St. Regis Costa Mujeres. White bands follow the seafront terraces around each bend. At the stair cores, slender horizontal slats screen the openings.

St. Regis Costa Mujeres
Project data
Developer
AB Living Group
Architect
Sordo Madaleno
Location
Playa Mujeres, Quintana Roo
Slab edges · base scope
15,930 linear ft4,855.55 linear m
Screens · base scope
41,279 linear ft12,581.74 linear m

Between the mangroves and the Caribbean

On the mainland coast of Isla Mujeres, north of Cancún and near the El Meco archaeological site, Sordo Madaleno oriented the terraces toward the sea or the mangroves. At the bends in the facade, aligned joints reveal how the curve is assembled. The projecting concrete shades the glazing below.

AB Living Group developed the property with Marriott International’s St. Regis brand. The site was announced in 2022 as 3.5 hectares. At its June 2026 opening, the resort comprised a 163-room-and-suite hotel and 86 private residences. The residences range from two to five bedrooms and include two-storey penthouses. Interior stonework draws on the nearby Maya port of El Meco.

The resort includes nine food and beverage venues, a spa with 16 treatment suites, a seafront infinity pool and the Astor Ballroom. The government of Quintana Roo reported a total development investment of US$250 million.

Photographic record · MODECO

Building the curve.

01 · Fabrication and transport

Each slab-edge profile takes shape at the plant. The pieces are arranged for transport and installation on the facade.

Architectural concrete pieces at the plant; their cross-section defines the facade profile.
Architectural concrete pieces at the plant; their cross-section defines the facade profile.
Precast elements arranged on racks for transport.
Precast elements arranged on racks for transport.

02 · Installation and continuity

On site, installation brings straight and curved pieces together. The joints between modules carry the lines around each terrace.

Positioning a precast slab edge facing the sea.
Positioning a precast slab edge facing the sea.
Precast slab edges continuing around the development’s inner curve.
Precast slab edges continuing around the development’s inner curve.

From mould to facade

15,930 linear ft4,855.55 linear mof slab edges
41,279 linear ft12,581.74 linear mof screen elements

Linear metres in the base scope. The November 2024 schedule lists 4,855.55 m and 12,581.74 m respectively. MODECO’s May 2026 portfolio rounds both figures.

Moulds for a family of curves

MODECO specified architectural concrete with a compressive strength of 250 kg/cm². Positive patterns were prepared to cast the negative moulds for changing curves. The second series included several radii and a reversed version.

The team coordinated fabrication and installation by elevation. At the stair cores, the site team checked the spacing and plumb of the screen supports. The installation scope included patching, joint sealing, cleaning and water-repellent treatment of the exposed faces.

Slab-edge installation in 2025

Each dated report counts installed slab edges only. Percentages use the original scope of 4,855.55 linear metres.

Report datePiecesMetresInstalled
Jun 22278898.00
18.49%
Aug 106311,989.80
40.98%
Sep 219392,848.71
58.67%
Nov 231,2683,747.90
77.19%
Dec 71,3593,979.73
81.96%

Changes on site

Edges at adjoining trades

In February 2026, MODECO documented 150.49 m of redesign to coordinate with adjoining trades and 59.13 m of additional facade edges fabricated and installed using custom moulds. In March, the team developed a layout for the edges of two residential terraces. Straight and curved precast sections followed the balustrades. The proposal for this change covered 15.37 m.

Twelve pieces to close an opening at Core 4

Drawing bulletin 14A, dated April 21, 2026, details twelve SH-322 slats, each 1.18 m long, 20.4 cm deep and 11.8 cm high, with a drip groove on the underside. The new section continues the lines of the adjacent screen. The June 18 site report shows the completed infill.

The hotel opened in June 2026. MODECO notified AB Living that its crew and equipment left the site on August 29, 2026, after the site supervision team received the work.

Aerial film · 1:34 · 2026

St. Regis Costa Mujeres

Curving terraces, continuous slab edges and the Caribbean-facing facade. An aerial tour filmed during construction in April 2026.